Revision Requests

13 of 2396 shown
Type
⚑ Urgent only
Title Sponsor Next Filed Last action ▴
PGRR003 New Planning Guide Section 9A, SSWG Procedure Manual Planning Working Group (PLWG) Withdrawn Nov 23 '10 May 26 '11
PGRR034 Asynchronous Tie Interconnection Process Pattern Energy Withdrawn Oct 8 '13 Oct 23 '13
PGRR035 DC Tie Interconnection Process John Moore on behalf... Withdrawn Nov 4 '13 Nov 22 '13
PGRR028 Evaluation of Compliance with Reactive Requirements ERCOT Withdrawn Feb 12 '13 Jun 5 '14
PGRR097 Related to NPRR1098, Direct Current Tie (DC Tie) Reactive Power Capability Requirements ERCOT Withdrawn Sep 29 '21 Nov 4 '21
PGRR111 Related to NPRR1191, Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater ERCOT Withdrawn Aug 1 '23 Sep 7 '23
PGRR105 Deliverability Criteria for DC Tie Imports Rainbow Energy... Withdrawn Apr 17 '23 May 22 '24
PGRR126 Related to NPRR1284, Guaranteed Reliability Load Process Cholla Petroleum Withdrawn May 12 '25 Jun 5 '25
PGRR135 Large Load Interconnection Queue Process Revision Cholla Petroleum Withdrawn Nov 4 '25 Nov 4 '25
PGRR134 Interconnection Studies Reform for Dispatchable Loads Luminary Strategies Withdrawn Nov 1 '25 Dec 4 '25
PGRR136 Large Load Interconnection Study Scope Documentation Schaper Energy Consulting Withdrawn Nov 25 '25 Jan 8 '26
PGRR138 Large Load Interconnection Study Review and Approval Process Schaper Energy Consulting Withdrawn Dec 1 '25 Jan 8 '26
PGRR141 Large Load Interconnection Study Reform for Substantiated Load Joint Sponsors Withdrawn Dec 31 '25 Feb 5 '26