ERCOT·WATCH Search ercot.com  ⌕
PGRR #141 · Revision Request

PGRR141  Large Load Interconnection Study Reform for Substantiated Load

Withdrawn sponsor Joint Sponsors posted 2025-12-31 next action Consideration ercot.com
ReasonStrategic Planning Objective 1
Created2026-02-05
Sections Affected
9.3.1
Summary
This Planning Guide Revision Request (PGRR) enables more efficient Large Load studies, approvals, and subsequent transmission planning by allowing a Regional Planning Group (RPG) review to be used in place of a separate Large Load Interconnection Study (LLIS) when evaluating a substantiated Large Load interconnection.