PGRR #136 · Revision Request
PGRR136 Large Load Interconnection Study Scope Documentation
ReasonStrategic Plan Objective 2
Created2026-01-08
Sections Affected
9.3.2
Summary
This Planning Guide Revision Request (PGRR) implements targeted revisions to Section 9.3.2 to strengthen Large Load Interconnection Study (LLIS) scoping requirements and improve transparency across ERCOT, Transmission Service Providers (TSPs), and Interconnecting Large Load Entities (ILLEs) by enhancing documentation.
Timeline
-
Nov 25 '25
ROSFiled by Schaper Energy Consulting
- Jan 8 '26
- Feb 5 '26
-
Mar 5 '26
Listed without action at 3 meetings (Mar 5 '26 – May 7 '26)
- Jun 4 '26