ERCOT·WATCH Search ercot.com  ⌕
PGRR #136 · Revision Request

PGRR136  Large Load Interconnection Study Scope Documentation

Withdrawn sponsor Schaper Energy Consulting posted 2025-11-25 next action Consideration ercot.com
ReasonStrategic Plan Objective 2
Created2026-01-08
Sections Affected
9.3.2
Summary
This Planning Guide Revision Request (PGRR) implements targeted revisions to Section 9.3.2 to strengthen Large Load Interconnection Study (LLIS) scoping requirements and improve transparency across ERCOT, Transmission Service Providers (TSPs), and Interconnecting Large Load Entities (ILLEs) by enhancing documentation.
Timeline