ERCOT·WATCH Search ercot.com  ⌕
PGRR #34 · Revision Request

PGRR034  Asynchronous Tie Interconnection Process

Withdrawn sponsor Pattern Energy posted 2013-10-08 next action Consideration ercot.com
ReasonTo formalize the Asynchronous Tie interconnection process in the Protocols and Guides.
Created2013-10-23
Sections Affected
2.255.15.1.15.1.25.2.15.35.3.15.3.25.45.4.15.4.25.4.2.15.4.2.25.4.35.4.45.4.55.4.5.15.4.65.4.75.4.85.4.95.4.105.55.5.15.5.25.5.35.5.45.65.75.7.15.7.25.7.35.7.45.7.55.85.8.15.8.25.3 (new)5.3.1 (new)5.3.2 (new)5.3.3 (new)5.3.3.1 (new)5.3.3.2 (new)5.3.4 (new)5.3.4.1 (new)5.3.5 (new)5.3.5.1 (new)5.3.5.2 (new)5.3.6 (new)5.3.7 (new)5.3.8 (new)5.3.8.1 (new)5.3.9 (new)5.3.10 (new)5.3.11 (new)5.3.12 (new)5.3.13 (new)5.3.14 (new)5.3.15 (new)5.3.15.1 (new)5.3.16 (new)5.3.17 (new)5.3.17.1 (new)5.3.18 (new)5.3.19 (new)5.3.20 (new)6.11 (new)
Summary
This Planning Guide Revision Request (PGRR) incorporates the ERCOT white paper describing the Asynchronous Tie Interconnection Process into the Planning Guides.
Timeline