PGRR #135 · Revision Request

PGRR135  Large Load Interconnection Queue Process Revision

Withdrawn sponsor Cholla Petroleum posted 2025-11-04 ercot.com
ReasonStrategic Plan Objective 2
Created2025-11-04
Sections Affected
9.3.4.1
Summary
This Planning Guide Revision Request (PGRR) changes the criteria of the Large Load Interconnection Study (LLIS) process to use demonstrated financial commitment in place of signed Load interconnection as a requirement for advancement.
Timeline