ERCOT·WATCH Search ercot.com  ⌕
VCMRR #12 · Revision Request

VCMRR012  Alignment with NPRR732, Adjustments to Verifiable Costs for Required Resubmissions and Clarification of RUC Forced Outage and Cancellation Procedures

Approved sponsor ERCOT posted 2015-10-28 ercot.com
ReasonAddresses current operational issues Administrative
Created2015-12-02
Sections Affected
Section 10
Summary
Nodal Protocol Revision Request (NPRR) 732 revises paragraph (11) of Protocol Section 5.6.1, Verifiable Costs, which describes how ERCOT will determine Resource costs in the event that a Qualified Scheduling Entity (QSE) or Resource Entity fails to file verifiable costs within 30 days of a request to file such costs. This Verifiable Cost Manual Revision Request (VCMRR) aligns language in the Verifiable Cost Manual with NPRR732 by deleting Verifiable Cost Manual language that contradicts Protocol language proposed by NPRR732.
Timeline