ERCOT·WATCH Search ercot.com  ⌕
SMOGRR #27 · Revision Request

SMOGRR027  Move OBD to Settlement Metering Operating Guide – EPS Metering Design Proposal

Approved sponsor ERCOT posted 2023-08-09 ercot.com
ReasonGeneral system and/or process improvement(s)
Created2023-09-06
Approved2024-04-11
Sections Affected
3.4 and 12 Attachment A (new)
Summary
This Settlement Metering Operating Guide Revision Request (SMOGRR) moves the EPS Metering Design Proposal from the Other Binding Document List into the Settlement Metering Operating Guide to standardize the approval process, and amends the design proposal form to require additional information identifying any and all Distribution Service Providers (DSPs) that have the right to serve a project. The amendments also make clear that this requirement does not apply to Wholesale Storage Load (WSL), and deletes references to the Resource Asset Registration Form (RARF) in the ERCOT-Polled Settlement (EPS) Metering Design Proposal form.
Timeline