ERCOT·WATCH Search ercot.com  ⌕
SMOGRR #25 · Revision Request

SMOGRR025  Modifications to Line Loss Compensation Requirement for EPS Metering

Approved sponsor ERCOT posted 2022-01-21 ercot.com
ReasonAddresses current operational issues; Market efficiencies or enhancements
Created2022-03-02
Approved2022-05-12
Sections Affected
8.4
Summary
This Settlement Metering Operating Guide Revision Request (SMOGRR) allows for losses in short runs of connecting lines to be disregarded in instances where the ERCOT-Polled Settlement (EPS) Meter is not physically placed at the Point of Interconnection (POI). This SMOGRR requires calculation to verify that the watts copper losses are below 0.001%.