SMOGRR018 EPS Metering for Three-Wire Wye Configurations
ReasonAddresses current operational issues
Created2016-09-22
Sections Affected
1.3.21.4.1
Summary
This Settlement Metering Operating Guide Revision Request (SMOGRR) allows an ERCOT-Polled Settlement (EPS) Meter to be installed for a facility that is connected to a three-wire wye, high or low impedance grounded distribution system, if the high or low impedance ground is installed as part of a fault monitoring system for the facility and no phase to ground loads or phase to ground sources are connected behind the metering point.
Timeline
- Aug 29 '16
-
Sep 22 '16
MWG MWG WebEx MeetingMWGRecommended for Approval Recommended for approval“To recommend approval of SMOGRR018 as submitted” — Passed→ MWG for Impact Analysis review
-
Oct 20 '16
MWGEmail Vote / Unlisted MeetingMWGRecommended for Approval Recommended for approval Forwarded → WMS“To endorse and forward to WMS the 9/22/16 MWG Report and Impact Analysis for SMOGRR018” — Passed→ WMS for consideration
-
Nov 2 '16
WMS WMS MeetingWMSRecommended for Approval Recommended for approval“To recommend approval of SMOGRR018 as recommended by MWG in the 10/20/16 MWG Report” — Passed→ TAC for consideration
-
Dec 1 '16
TAC TAC MeetingTACApproved Recommended for approval“To approve SMOGRR018 as recommended by WMS in the 11/2/16 WMS Report” — Passed
-
—
Posted since the last meeting