SCR770 Revision to Outage Scheduler Entry for Resource Maintenance Outage Level Designation
ReasonThe current Outage Scheduler system does not allow the user to provide all of the information ERCOT needs for optimal and precise Outage scheduling and actually could infer information in an incorrect way. The system needs to request additional information to adequately inform ERCOT of the need for a Maintenance Outage.
Created2012-02-23
Approved2012-05-15
Sections Affected
Not applicable
Summary
This System Change Request (SCR) will make a change to the Outage Scheduler system so that the Qualified Scheduling Entity (QSE) is able to schedule Level I, II and III Maintenance Outages in a way that coincides with the definition of these Maintenance Outages shown in Protocol Section 2.1. Currently the data entry into the Outage Scheduler allows the user to enter the start of the proposed Outage only and the system infers from that the Maintenance Level of the Outage. However, there are instances where the start of the Outage can actually be earlier than that required by the designated Maintenance Level. The system needs to be changed so that the user can enter the requested start date of the Outage separately from the duration of time allowed before the maintenance would prevent a Forced Outage.
Timeline
-
Jan 18 '12
PRSFiled by Luminant Energy Company LLC
-
Feb 23 '12
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval Recommended for approval“To recommend approval of SCR770 as submitted.” — Passed→ PRS review the Impact Analysis
- Mar 22 '12
-
Mar 29 '12
PRSEmail Vote / Unlisted MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC priority 2013 · rank 700“To endorse and forward the 2/23/12 PRS Report and Impact Analysis for SCR770 to TAC with a recommended priority of 2013 and rank of 700.”→ TAC consideration
-
Apr 5 '12
TAC Technical Advisory Committee (TAC) MeetingTACRecommended for Approval Recommended for approval“To recommend approval of SCR770 as recommended by PRS in the 3/22/12 PRS Report” — Passed→ ERCOT Board Consideration
-
May 15 '12
BOARDEmail Vote / Unlisted MeetingBOARDApproved Approved“To approve SCR770 as recommended by TAC in the 4/5/12 TAC Report.” — Passed
-
Feb 12 '13
Listed without action at 4 meetings (Feb 12 '13 – Mar 13 '13)