RRGRR009 Adding Voltage Limit Sets, Relay Loadability, MLSE, and GMD Data
ReasonOther
Created2016-03-28
Approved2016-10-11
Sections Affected
2
Summary
This Resource Registration Glossary Revision Request (RRGRR) adds three categories of data: Voltage limits are needed for Resources to indicate that their substation transmission level equipment is limited to a certain range of voltages. The relay loadability limits indicate the limits of loading for certain equipment. Geomagnetic Disturbance is a newly emphasized risk to the grid. The addition of geomagnetically-induced currents and the presence of blocking devices will allow for the study of any vulnerability due to Geomagnetic Disturbance. The addition of a Most Limiting Single Element (MLSE) allows a Resource Entity to identify an MLSE even if that element affects a line not owned by a Resource Entity.
Timeline
- Feb 26 '16
- Mar 28 '16
-
Apr 25 '16
RDWG RDWG MeetingRDWGRecommended for Approval Recommended for approval Amended by the Mar 8 '16 ERCOT comments“To recommend approval of RRGRR009 as amended by the 3/8/16 ERCOT comments and as revised by RDWG.” — Passed→ Impact Analysis Consideration
-
Jun 3 '16
RDWG RDWG MeetingRDWGRecommended for Approval Recommended for approval Forwarded → ROS Amended by the May 11 '16 ERCOT comments priority 2016 · rank 1505“To endorse and forward to ROS the 4/25/16 RDWG Report as amended by the 5/11/16 ERCOT comments and the Impact Analysis for RRGRR009 with a recommended priority of 2016 and rank of 1505.” — Passed→ Revision Request Consideration
-
Jun 9 '16
ROS ROS MeetingROSDeferred/Tabled Tabled“To table RRGRR009.” — Passed→ Revision Request Consideration
-
Jun 27 '16
Listed without action at 2 meetings (Jun 27 '16 – Jun 28 '16)
-
Jul 7 '16
ROS ROS MeetingROSRecommended for Approval Recommended for approval Amended by the Jun 30 '16 NRG comments“To recommend approval of RRGRR009 as recommended by RDWG in the 6/3/16 RDWG Report as amended by the 6/30/16 NRG comments.” — Passed→ Revision Request Consideration
- Jul 14 '16
- Jul 22 '16
-
Jul 28 '16
TAC TAC MeetingTACRecommended for Approval Recommended for approval Amended by the Jul 20 '16 ERCOT comments“To recommend approval of RRGRR009 as recommended by ROS in the 7/7/16 ROS Report and as amended by the 7/20/16 ERCOT comments.” — Passed→ Revision Request Consideration
- Aug 9 '16
-
Oct 11 '16
BOARDEmail Vote / Unlisted MeetingBOARDApproved Approved“To approve RRGRR009 as recommended by TAC in the 7/28/16 TAC Report with an ERCOT Board action effective date of 8/9/16.” — Passed
-
—
Posted since the last meeting