PGRR #95 · Revision Request

PGRR095  Establish Minimum Deliverability Criteria

Approved sponsor ERCOT posted 2021-08-26 ercot.com
ReasonAddresses current operational issues; Meets Strategic goals (tied to the ERCOT Strategic Plan or directed by the ERCOT Board).
Created2021-10-07
Approved2022-03-31
Sections Affected
4.1.1.7 (new)
Summary
This Planning Guide Revision Request (PGRR) establishes minimum deliverability criteria for Resources that are located within the ERCOT System and whose output is primarily within ERCOT’s control, through Dispatch Instructions, over the entire real power capability range of each Resource.