ERCOT·WATCH Search ercot.com  ⌕
PGRR #75 · Revision Request

PGRR075  Dynamic Model Quality Requirement

Approved sponsor ERCOT posted 2019-10-22 ercot.com
ReasonOther: Improve dynamic model quality in alignment with 2019 Reliability and Operations Subcommittee (ROS) goals
Created2019-11-07
Approved2020-04-14
Sections Affected
5.7.16.26.2.26.2.46.2.5 (delete)
Summary
This Planning Guide Revision Request (PGRR) adds a requirement for Resource Entities and Interconnecting Entities (IEs) to provide model quality test results that demonstrate appropriate performance for submitted dynamic models. Additional revisions are proposed to: Clarify that dynamic model data shall be provided using the appropriate dynamic model template; Raise awareness of requirements associated with user written dynamic models (move from Dynamics Working Group Procedure Manual to Planning Guide); Make various miscellaneous language updates and corrections, including the elimination of Section 6.2.5, which has been superseded by North American Electric Reliability Corporation (NERC) Reliability Standard PRC-002-2, Disturbance Monitoring and Reporting Requirements, and Nodal Operating Guide Section 6.1.3, Phasor Measurement Recording Equipment Including Dynamic Disturbance Recording Equipment.
Timeline