PGRR #46 · Revision Request

PGRR046  Addition of Geomagnetically Induced Current (GIC) Model Building Requirements

Approved sponsor ERCOT posted 2016-02-26 ercot.com
ReasonRegulatory requirements
Created2016-03-23
Approved2016-10-11
Sections Affected
2.26.11(new)
Summary
This Planning Guide Revision Request (PGRR) aligns the Planning Guides with North American Electric Reliability Corporation (NERC) Reliability Standard TPL-007-1, Transmission System Planned Performance for Geomagnetic Disturbance Events, by specifying a process for developing geomagnetically-induced current system models.