PGRR #42 · Revision Request

PGRR042  Regional Transmission Plan Model Reserve Requirement and Load-Generation Imbalance Methodology

Approved sponsor ERCOT posted 2015-02-05 ercot.com
ReasonMeets strategic goals.
Created2015-03-25
Approved2016-12-13
Sections Affected
3.1.1.23.1.33.1.3.13.1.4.13.1.4.1.13.1.4.23.1.7
Summary
Establishes a required reserve amount for Regional Transmission Plan base cases, documents the methodology to be used when total generation capacity in a case is less than Load plus losses plus the reserve amount, and conforms the maximum dispatch level for Wind-powered Generation Resources (WGRs) and solar Resources to the capacity level used in the Capacity, Demand, and Reserves report.
Timeline