PGRR038  Require ERCOT to Report Circuits Loaded Above 95% of Their Facility Rating

Approved sponsor ERCOT posted 2014-05-21 ercot.com
ReasonAddresses current operational issues; and Other: The Operations and Planning Synchronization Task Force (OPSTF) identified several factors that could lead to overloads in operations that were not observed in planning studies. This PGRR will require ERCOT to report circuits that are near overload so that planners are aware of them.
Created2014-07-10
Approved2014-08-12
Sections Affected
3.1.1.2
Summary
This Planning Guide Revision Request (PGRR) requires ERCOT to report when circuits are loaded above 95% of their Facility Rating for single contingency events in the annual Regional Transmission Plan.
Timeline