PGRR #38 · Revision Request
PGRR038 Require ERCOT to Report Circuits Loaded Above 95% of Their Facility Rating
ReasonAddresses current operational issues; and Other: The Operations and Planning Synchronization Task Force (OPSTF) identified several factors that could lead to overloads in operations that were not observed in planning studies. This PGRR will require ERCOT to report circuits that are near overload so that planners are aware of them.
Created2014-07-10
Approved2014-08-12
Sections Affected
3.1.1.2
Summary
This Planning Guide Revision Request (PGRR) requires ERCOT to report when circuits are loaded above 95% of their Facility Rating for single contingency events in the annual Regional Transmission Plan.
Timeline
- May 21 '14
-
Jun 18 '14
Listed without action at 1 meeting
-
Jul 10 '14
ROS ROS MeetingROSRecommended for Approval Recommended for approval Amended by the ROS comments“To recommend approval of PGRR038 as revised by ROS with Option 1.” — Passed→ TAC for consideration.
- Jul 23 '14
-
Jul 31 '14
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of PGRR038 as recommended by ROS in the 7/10/14 ROS Report.” — Passed→ ERCOT Board for consideration.
-
Aug 12 '14
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“To approve PGRR038 as recommended by TAC in the 7/31/14 TAC Report.” — Passed
- Aug 20 '14