PGRR #31 · Revision Request

PGRR031  Implement 95% Facility Rating Limit in the Planning Criteria

Rejected sponsor PLWG posted 2013-06-12 ercot.com
ReasonThe Operations and Planning Synchronization Task Force (OPSTF) identified several factors that could lead to overloads in operations that were not observed in planning studies.
Created2013-08-28
Rejected2014-08-12
Sections Affected
4.1.1.2
Summary
This Planning Guide Revision Request (PGRR) changes the planning criteria such that system improvements are planned when studies show Facilities will be loaded up to 95% of their applicable rating.
Timeline