PGRR #27 · Revision Request
PGRR027 Analysis of Subsynchronous Resonance Studies in Transmission Studies
ReasonWith the addition of multiple series compensated transmission lines to the ERCOT Transmission Grid, the ERCOT System has become vulnerable to much higher risk of SSR between series compensated lines and other Transmission Elements. Type 3 wind turbines (duel feed induction generators) are more vulnerable than most other Transmission Elements to this condition. The combination of series compensated lines and Type 3 wind turbines in the Competitive Renewable Energy Zone (CREZ) transmission zones makes procedures to protect against this reliability problem critical. This PGRR will provide for these procedures.
Created2013-02-27
Approved2013-07-16
Sections Affected
2.25.1.25.4.15.4.25.4.2.15.4.5.15.7.5
Summary
This Planning Guide Revision Request (PGRR) describes how ERCOT will act to protect the ERCOT Transmission Grid from Subsynchronous Resonance (SSR) oscillations since installation of multiple series compensated transmission lines has increased ERCOT’s vulnerability to such oscillations.
Timeline
- Jan 15 '13
-
Feb 27 '13
PLWG Planning Working Group (PLWG) MeetingPLWGRecommended for Approval Recommended for approval Amended by the Feb 22 '13 CenterPoint Energy comments Amended by the PLWG comments“To recommend approval of PGRR027 as amended by the 2/22/13 CenterPoint Energy comments and as revised by PLWG”→ PLWG IA Review
-
Mar 27 '13
PLWGEmail Vote / Unlisted MeetingPLWGRecommended for Approval Recommended for approval Forwarded → ROS Amended by the Mar 26 '13 Oncor comments“Consensus to endorse and forward the 2/27/13 PLWG Report as amended by the 3/26/13 Oncor comments and as revised by PLWG and the Impact Analysis to ROS”→ ROS Consideration
-
Apr 11 '13
ROS Reliability and Operations Subcommittee (ROS) MeetingROSRecommended for Approval Recommended for approval Amended by the Mar 27 '13 PLWG comments Amended by the ROS comments“To recommend approval of PGRR027 as recommended by PLWG in the 3/27/13 PLWG Report and as revised by ROS” — Passed→ TAC Consideration
-
May 2 '13
TAC Technical Advisory Committee (TAC) MeetingTACRecommended for Approval Recommended for approval“To recommend approval of PGRR027 as recommended by ROS in the 4/11/13 ROS Report” — Passed→ ERCOT Board Consideration
- Jun 26 '13
- Jul 2 '13
-
Jul 16 '13
BOARD Board of Directors MeetingBOARDApproved Recommended for approval Amended by the Jul 2 '13 TAC comments“To approve PGRR027 as amended by the 7/2/13 TAC comments” — Passed
- Aug 28 '13