PGRR #25 · Revision Request
PGRR025 Addition of Criteria for Autotransformer Unavailability
ReasonAt its 9/13/12 meeting, ROS directed the Planning Working Group (PLWG) to modify the ERCOT planning criteria to add ERCOT System performance testing associated with the unavailability of an autotransformer. High voltage autotransformers are typically known to have long lead delivery times ranging anywhere between one year to two years. The outage and subsequent long-term unavailability of autotransformers can impact ERCOT System reliability and needs to be accounted for in planning studies. The proposed North American Electric Reliability Corporation (NERC) Reliability Standard TPL-001-2, Transmission System Planning Performance Requirements, R.2.1, 2.1.5 requires Entities to assess the impact of the possible unavailability of major transmission equipment having a lead time of one year or more (such as a transformer) on system performance. Proposed performance testing requirements are limited to paragraphs (1)(c) and 1(d) and line 3 of Table 1, ERCOT-specific Reliability Performance Criteria, of Section 4.1.1.2.
Created2012-12-04
Sections Affected
4.1.1.2
Summary
This Planning Guide Revision Request (PGRR) adds testing and performance requirements to the ERCOT reliability criteria for the unavailability of any 345/138 kV autotransformer.
Timeline
- Nov 2 '12
-
Dec 4 '12
PLWG Planning Working Group (PLWG) MeetingPLWGRecommended for Approval Recommended for approval“Consensus to recommend approval of PGRR025 as submitted”→ PLWG IA Review
-
Jan 23 '13
PLWG Planning Working Group (PLWG) MeetingPLWGRecommended for Approval Recommended for approval Forwarded → ROS“To endorse and forward the 12/4/12 PLWG Report and Impact Analysis for PGRR025 to ROS”→ ROS Consideration
-
Feb 14 '13
ROS Reliability and Operations Subcommittee (ROS) MeetingROSRecommended for Approval Recommended for approval“To recommend approval of PGRR025 as recommended by PLWG in the 1/23/13 PLWG Report” — Passed→ TAC Consideration
-
Mar 7 '13
TAC Technical Advisory Committee (TAC) MeetingTACRecommended for Approval Recommended for approval“To recommend approval of PGRR025 as recommended by ROS in the 2/14/13 ROS Report” — Passed→ ERCOT Board Consideration
- Mar 27 '13
-
May 14 '13
BOARD Board of Directors MeetingBOARDRecommended for Approval Recommended for approval“To approve PGRR025 as recommended by TAC in the 3/7/13 TAC Report” — Passed
-
—
Posted since the last meeting