PGRR #11 · Revision Request
PGRR011 Planning Criteria Clarifications and Enhancements To Narrow The Gap Between Operations and Planning
ReasonTAC has directed ROS to develop planning processes that eliminate the gap between operations and planning in order to significantly reduce the amount of unmanageable constraints that have been observed in Real-Time. It is recognized that unmanageable constraints in Real-Time can arise for a variety of reasons, only some of which may be improved with these transmission planning recommendations; while many of the others may be improved with operational planning enhancements. This PGRR represents the recommended modifications to the transmission planning process. A companion set of recommended modifications that were identified for the operational planning (i.e., Outage approval planning and Reliability Unit Commitment (RUC)) process have been submitted under Nodal Protocol Revision Request (NPRR) 409, Outage Planning Criteria Clarifications and Enhancements to Narrow Gap Between Real-Time Operations and Outage Planning, and Nodal Operating Guide Revision Request (NOGRR) 078, Real-Time Security Analysis Language Clean Up to Reconcile Operating Guides with Current Operation Practice.
Created2011-08-26
Rejected2011-11-10
Sections Affected
2.12.24.1.1.14.1.1.2
Summary
This Planning Guide Revision Request (PGRR) provides clarifications and additions to the transmission planning criteria to address the gap between operations and planning processes in order to develop adequate transmission capacity to minimize the likelihood of unmanageable constraints (i.e. Security-Constrained Economic Dispatch (SCED) irresolvable constraints) being encountered in Real-Time.
Timeline
- Aug 5 '11
- Aug 10 '11
-
Aug 11 '11
Listed without action at 2 meetings (Aug 11 '11 – Aug 12 '11)
-
Aug 26 '11
PLWG Joint CMWG/PLWG MeetingPLWGDeferred/Tabled Tabled“consensus to table PGRR011”→ PLWG Language Consideration
- Aug 31 '11
-
Sep 7 '11
CMWG Joint CMWG/PLWG MeetingCMWG Amended by the Sep 1 '11 Luminant comments Forwarded → ROS“The PLWG could not reach consensus on PGRR011 but was in agreement to forward PGRR011 as amended by the 9/1/11 Luminant comments and as revised by the PLWG to ROS”→ ROS Consideration
- Sep 14 '11
- Sep 15 '11
- Sep 30 '11
- Oct 12 '11
-
Oct 13 '11
Listed without action at 1 meeting
- Oct 21 '11
-
Nov 9 '11
Listed without action at 1 meeting
- Nov 10 '11
- Dec 1 '11