OBDRR #21 · Revision Request
OBDRR021 Correction to Calculation in Procedure for Calculating Responsive Reserve (RRS) Limits for Individual Resources
ReasonAddresses current operational issues
Created2020-06-24
Sections Affected
Procedure for Calculating Responsive Reserve (RRS) Limits for Individual Resources
Summary
This Other Binding Document Revision Request (OBDRR) aligns the language in the Procedure for Calculating Responsive Reserve (RRS) Limits for Individual Resources with the Protocols following Phase 1 implementation of Nodal Protocol Revision Request (NPRR) 863, Creation of ERCOT Contingency Reserve Service and Revisions to Responsive Reserve, and corrects inadvertent errors in the formulae for calculating droop performance to determine Responsive Reserve (RRS) limits. The Performance, Disturbance, Compliance Working Group (PDCWG) reviewed these updates at their April 15, 2020 WebEx-only meeting. Listed below is a summary of the modifications that are being proposed by this OBDRR: a) Recognize that any Generation Resource capable of operating in synchronous condenser fast-response mode can provide RRS; b) Clarify RRS limits applicable to Resources providing RRS as Fast Frequency Response (FFR); and c) Correct inadvertent errors in the formulae for calculating droop performance to determine RRS limits.
Timeline
- May 6 '20
-
Jun 4 '20
Listed without action at 1 meeting
-
Jun 24 '20
TAC TAC MeetingTACRecommended for Approval Recommended for approval Amended by the TAC comments“to recommend approval of OBDRR021 as revised by TAC” — Passed→ Impact Analysis Consideration
-
Jul 29 '20
TAC TAC MeetingTACApproved Recommended for approval Forwarded → TAC“to approve the 6/24/20 TAC Report and the Impact Analysis for OBDRR021” — Passed
-
—
Posted since the last meeting