NPRR #966 · Revision Request

NPRR966  Changes to Support Reactive Power Coordination Tool

Withdrawn sponsor ERCOT posted 2019-08-09 next action Consideration ercot.com
ReasonAddresses current operational issues. Market efficiencies or enhancements.
Created2019-09-12
Sections Affected
2.13.1.4.33.1.4.43.10.7.1.43.10.7.1.5and 6.5.7.7
Summary
This Nodal Protocol Revision Request (NPRR) aligns Protocols with a new ERCOT project to implement a Reactive Power Coordination tool that produces an optimized reactive Dispatch schedule to be implemented by ERCOT Transmission Operators. This Dispatch schedule will be updated hourly and include the desired state of reactors and capacitors, desired tap positions of transformers with adjustable taps, and Voltage Set Points for synchronous condensers, static Volt-Ampere reactive (VAr) compensators, static synchronous compensators, and Generation Resources.
Timeline