NPRR #938 · Revision Request
NPRR938 Distribution Voltage Level Block Load Transfer (BLT) Compensation
ReasonAddresses current operational issues, Regulatory requirements
Created2019-06-13
Sections Affected
6.6.3.5
Summary
This Nodal Protocol Revision Request (NPRR) provides for the compensation of distribution voltage level Block Load Transfers (BLTs) that are instructed to switch from the ERCOT Control Area to a non-ERCOT Control area.
Timeline
-
Apr 26 '19
PRSFiled by Golden Spread Electric Cooperative
-
Jun 13 '19
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → WMS“to table NPRR938 and refer the issue to WMS” — Passed→ Language Consideration
- Jul 10 '19
-
Jul 17 '19
Listed without action at 1 meeting
- Aug 7 '19
-
Aug 15 '19
Listed without action at 8 meetings (Aug 15 '19 – Dec 12 '19)
- Jan 16 '20
-
Jan 29 '20
Listed without action at 1 meeting