NPRR #917 · Revision Request
NPRR917 Nodal Pricing for Settlement Only Distribution Generators (SODGs) and Settlement Only Transmission Generators (SOTGs)
ReasonAddresses current operational issues. Meets Strategic goals. Market efficiencies / enhancements.
Created2019-01-17
Approved2019-08-13
Sections Affected
6.3.26.6.3.26.6.3.9 (new)6.6.109.5.39.19.110.3.2.316.11.4.3.2and 23N (new)
Summary
This Nodal Protocol Revision Request (NPRR) implements nodal energy pricing, instead of the current Load Zone energy pricing, for Settlement Only Distribution Generators (SODGs) and Settlement Only Transmission Generators (SOTGs). For an SODG, the energy price used as the basis for the 15-minute Real-Time price calculation is the time-weighted price at the Electrical Bus associated with the mapped Load of the SODG in the Network Operations Model. For an SOTG, the energy price used as the basis for the 15-minute Real-Time price calculation is the time-weighted price at the Electrical Bus as determined by ERCOT in review of the meter location of the SOTG in the Network Operations Model. This NPRR also allows existing SODGs and SOTGs to apply to ERCOT to continue to receive Load Zone energy pricing until such time as they proactively opt in for nodal pricing, or January 1, 2030, whichever is earlier.
Timeline
- Jan 2 '19
-
Jan 9 '19
Listed without action at 2 meetings (Jan 9 '19 – Jan 11 '19)
-
Jan 17 '19
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → ROS Referred → WMS“To table NPRR917 and refer the issue to ROS and WMS” — Passed→ PRS for consideration
- Jan 22 '19
-
Feb 6 '19
Listed without action at 1 meeting
- Feb 7 '19
- Feb 14 '19
-
Feb 25 '19
Listed without action at 2 meetings (Feb 25 '19 – Feb 26 '19)
- Mar 6 '19
-
Mar 14 '19
Listed without action at 1 meeting
- Apr 3 '19
-
Apr 11 '19
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the Apr 4 '19 ERCOT comments“To recommend approval of NPRR917 as amended by the 4/4/19 ERCOT comments” — Passed→ PRS for Impact Analysis review
- May 6 '19
-
May 9 '19
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC Amended by the May 8 '19 ERCOT Steel Mills comments priority 2019 · rank 2700“To endorse and forward to TAC the 4/11/19 PRS Report as amended by the 5/8/19 ERCOT Steel Mills comments as revised by PRS and the Impact Analysis for NPRR917 with an effective date of July 1, 2019 for Section 23, Form N, and a recommended priority of 2019 and rank of 2700” — Passed→ TAC for consideration
- May 22 '19
- May 28 '19
-
Jul 24 '19
TAC TAC MeetingTACRecommended for Approval Recommended for approval Amended by the Jul 17 '19 LCRA comments“To recommend approval of NPRR917 as recommended by PRS in the 5/9/19 PRS Report as amended by the 7/17/19 LCRA comments as revised by TAC” — Passed→ Board for consideration
-
Aug 13 '19
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“To approve NPRR917 as recommended by TAC in the 7/24/19 TAC Report” — Passed
-
Feb 11 '21
Listed without action at 4 meetings (Feb 11 '21 – Apr 13 '21)