NPRR #866 · Revision Request
NPRR866 Mapping Registered Distributed Generation and Load Resources to Transmission Loads in the Network Operations Model
ReasonAddresses current operational issues; Meets Strategic goals, Market efficiencies or enhancements
Created2018-03-08
Approved2018-08-07
Sections Affected
3.10.7.2
Summary
This Nodal Protocol Revision Request (NPRR) accomplishes two objectives related to mapping registered Distributed Generation (DG) and Load Resources to transmission Loads in the Network Operations Model. Specifically, this NPRR expands paragraph (2) of Section 3.10.7.2 to codify the existing process for mapping a Load Resource or an Aggregate Load Resource (ALR) to its appropriate Load point in the Network Operations Model; and outlines in a new paragraph (3) of Section 3.10.7.2 the practice for mapping a registered DG facility to its appropriate Load point in the Network Operations Model. These changes would affect all existing and future DG facilities that have registered or will register with ERCOT pursuant to paragraph (5) of Section 16.5, Registration of a Resource Entity. DG registration is required for any DG facility with a capacity rating above the registration threshold, currently set at 1 MW, and which injects energy to the distribution grid. Registration with ERCOT is optional for smaller DG facilities.
Timeline
- Feb 14 '18
-
Mar 1 '18
Listed without action at 1 meeting
-
Mar 8 '18
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → ROS Referred → WMS“To table NPRR866 and to refer the issue to ROS and WMS.” — Passed→ Language Consideration
- Mar 27 '18
-
Apr 4 '18
Listed without action at 1 meeting
- Apr 5 '18
- Apr 12 '18
-
Apr 19 '18
Listed without action at 4 meetings (Apr 19 '18 – May 10 '18)
- May 23 '18
-
Jun 7 '18
Listed without action at 1 meeting
-
Jun 14 '18
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the May 16 '18 Oncor comments“To recommend approval of NPRR866 as amended by the 5/16/18 Oncor comments as revised by PRS.” — Passed→ Impact Analysis Consideration
-
Jul 12 '18
Listed without action at 1 meeting
-
Jul 19 '18
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC priority 2018 · rank 2270“To endorse and forward to TAC the 6/14/18 PRS Report and Impact Analysis for NPRR866 with a recommended priority of 2018 and a rank of 2270.” — Passed→ Revision Request Consideration
-
Jul 26 '18
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR866 as recommended by PRS in the 7/19/18 PRS Report.” — Passed→ Revision Request Consideration
-
Aug 7 '18
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“To approve NPRR866 as recommended by TAC in the 7/26/18 TAC Report.” — Passed
- Mar 26 '19