NPRR #857 · Revision Request
NPRR857 Creation of Direct Current Tie Operator Market Participant Role
ReasonRegulatory requirements
Created2017-12-14
Approved2018-10-09
Sections Affected
1.21.3.1.12.12.23.1.13.1.23.1.3.13.1.4.13.1.4.23.1.4.33.1.4.43.1.4.63.1.5.13.1.5.23.1.5.33.1.5.43.1.5.63.1.5.73.1.5.83.1.5.93.1.5.103.1.5.113.1.5.123.3.13.3.23.3.2.13.5.13.103.10.13.10.43.10.53.10.7.13.10.7.1.13.10.7.1.23.10.7.1.33.10.7.1.43.10.7.2 3.10.7.43.10.7.53.10.7.5.13.10.7.5.23.10.9.23.14.23.20.24.4.46.5.1.26.5.26.5.36.5.7.1.56.5.7.1.116.5.7.1.136.5.7.86.5.7.96.5.9.36.5.9.3.16.5.9.3.26.5.9.3.36.5.9.488.316.172222
Summary
This Nodal Protocol Revision Request (NPRR) creates the Market Participant role of “Direct Current Tie Operator (DCTO),” in order to clarify the obligations of Entities that operate Direct Current Ties (DC Ties) interconnected with the ERCOT System. This NPRR is proposed in accordance with the May 23, 2017 order of the Public Utility Commission of Texas (PUCT) in Project No. 46304, which requires ERCOT to address a number of issues as a condition for the energization of the DC Tie project proposed by Southern Cross Transmission LLC (“Southern Cross”). Directive 1 in the order requires ERCOT, among other things, to “determine the appropriate market participation category for [Southern Cross] and for any other entity associated with the Southern Cross DC Tie for which a new market-participant category may be appropriate (creating new ones if necessary . . . .” Because all DC Ties in the ERCOT System are currently owned by Transmission Service Providers (TSPs), the Protocols do not currently establish the obligations of Entities that operate DC Ties as distinct from the obligations of TSPs more generally. Southern Cross will not qualify as a TSP, as that term is presently defined, because it will not own Transmission Facilities subject to the jurisdiction of the PUCT. Moreover, many of the rights and responsibilities of TSPs are arguably inappropriate for operators of DCTOs who do not own networked Transmission Facilities—for example, full Outage Scheduler visibility, participation in generator interconnection studies, and participation on Transmission Operator hotline calls. This NPRR proposes the DCTO role in an effort to separate out the obligations specific to those Entities that operate DC Ties as distinct from the obligations specific to TSPs. Consequently, this NPRR would require any TSP that currently operates a DC Tie to add an additional registration as a DCTO.
Timeline
- Nov 29 '17
-
Dec 14 '17
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → WMS Referred → ROS“To table NPRR857 and refer the issue to WMS and ROS.” — Passed→ Language Consideration
- Jan 10 '18
- Jan 11 '18
-
Jan 18 '18
Listed without action at 1 meeting
- Jan 31 '18
-
Feb 1 '18
Listed without action at 6 meetings (Feb 1 '18 – Mar 1 '18)
-
Mar 8 '18
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the Mar 5 '18 Sharyland comments“To recommend approval of NPRR857 as amended by the 3/5/18 Sharyland comments.” — Passed→ Impact Analysis Consideration
- Mar 27 '18
-
Apr 5 '18
Listed without action at 1 meeting
-
Apr 12 '18
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC priority 2019 · rank 2530“To endorse and forward to TAC the 3/8/18 PRS Report as revised by PRS and the Impact Analysis for NPRR857 with a recommended priority of 2019 and rank of 2530.” — Passed→ Revision Request Consideration
- Apr 19 '18
-
May 3 '18
Listed without action at 1 meeting
-
May 24 '18
TAC TAC MeetingTACDeferred/Tabled Tabled“To table NPRR857.” — Passed→ Revision Request Consideration
-
Jun 7 '18
Listed without action at 2 meetings (Jun 7 '18 – Jul 26 '18)
-
Sep 26 '18
TAC TAC MeetingTACRecommended for Approval Recommended for approval Amended by the Sep 19 '18 ERCOT comments“to recommend approval of NPRR857 as recommended by PRS in the 4/12/18 PRS Report and as amended by the 9/19/18 ERCOT comments; and to endorse the Revised Impact Analysis for NPRR857 with a proposed effective date of upon system implementation and satisfying the conditions as stated in the 9/19/18 Revised Impact Analysis” — Passed→ Revision Request Consideration
-
Oct 9 '18
BOARD Board of Directors MeetingBOARDApproved Approved“approved NPRR857 as recommended by TAC in the 9/26/18 TAC Report” — Passed