NPRR #849 · Revision Request
NPRR849 Clarification of the Range of Voltage Set Points at a Generation Resource’s POI
ReasonAddresses current operational issues
Created2017-10-12
Approved2019-12-10
Sections Affected
3.15
Summary
This Nodal Protocol Revision Request (NPRR) revises Section 3.15 to clarify the range of voltages at the Point of Interconnection (POI) and circumstances for which a Generation Resource’s reactive capability must be designed to meet. This NPRR does not modify any other provisions within Section 3.15 or its subsections; does not change the Generation Resource’s responsibility to adhere to Voltage Set Points; and does not modify the 2% tolerance band identified in paragraph (4) of Nodal Operating Guide Section 2.7.3.5, Resource Entity Responsibilities and Generation Resource Requirements. Rather, this NPRR simply aims to more clearly specify the reactive capability the Generation Resource must be designed to provide.
Timeline
- Sep 27 '17
-
Oct 12 '17
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → ROS“To table NPRR849 and refer the issue to ROS” — Passed→ PRS for consideration
- Nov 2 '17
- Nov 9 '17
-
Nov 17 '17
Listed without action at 1 meeting
- Dec 14 '17
-
Jan 11 '18
Listed without action at 3 meetings (Jan 11 '18 – Jan 22 '18)
- Feb 1 '18
-
Feb 8 '18
Listed without action at 7 meetings (Feb 8 '18 – Apr 5 '18)
- Apr 12 '18
-
May 3 '18
Listed without action at 4 meetings (May 3 '18 – Jun 14 '18)
- Jul 12 '18
-
Jul 18 '18
Listed without action at 6 meetings (Jul 18 '18 – Sep 6 '18)
- Sep 13 '18
- Sep 20 '18
-
Oct 11 '18
Listed without action at 2 meetings (Oct 11 '18 – Oct 18 '18)
- Oct 26 '18
-
Nov 8 '18
Listed without action at 6 meetings (Nov 8 '18 – Jan 17 '19)
- Jan 24 '19
-
Feb 7 '19
Listed without action at 9 meetings (Feb 7 '19 – Apr 18 '19)
- May 2 '19
-
May 9 '19
Listed without action at 2 meetings (May 9 '19 – Jun 13 '19)
- Jun 26 '19
- Jul 11 '19
- Jul 17 '19
-
Aug 15 '19
Listed without action at 1 meeting
-
Sep 12 '19
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the Sep 11 '19 ERCOT comments“To recommend approval of NPRR849 as amended by the 9/11/19 ERCOT comments” — Passed→ PRS for Impact Analysis consideration
-
Oct 10 '19
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC“To endorse and forward to TAC the 9/12/19 PRS Report and Impact Analysis for NPRR849” — Passed→ TAC for consideration
-
Oct 23 '19
TAC TAC MeetingTACRecommended for Approval Recommended for approval Amended by the Oct 22 '19 ERCOT comments“To recommend approval of NPRR849 as recommended by PRS in the 10/10/19 PRS Report as amended by the 10/22/19 ERCOT comments” — Passed→ Board for consideration
-
Dec 10 '19
BOARD Board of Directors MeetingBOARDApproved Approved“To approve NPRR849 as recommended by TAC in the 10/23/19 TAC Report” — Passed
-
—
Posted since the last meeting