NPRR #846 · Revision Request
NPRR846 Allow Previously Committed ERS Resources to Participate in MRA Agreements and Other ERS Items
ReasonAddresses current operational issues; Administrative; Regulatory Requirements
Created2017-09-14
Approved2017-12-12
Sections Affected
2.13.14.3.18.1.3.1.18.1.3.1.28.1.3.1.3.18.1.3.1.3.28.1.3.1.3.38.1.3.1.48.1.3.28.1.3.3.18.1.3.3.2
Summary
This Nodal Protocol Revision Request (NPRR) addresses a number of changes pertaining to the Emergency Response Service (ERS): 1) Allows previously committed ERS Resources to participate in Must-Run Alternative (MRA) Agreements as ordered in Public Utility Commission of Texas (PUCT) Project No. 45927, Rulemaking Regarding Emergency Response Service. 2) Modifies the methodology for evaluating the performance during the first partial interval for ERS Loads on the alternate baseline. The current methodology produces incorrect results when the average Load for the first partial interval is above its maximum base Load, but in reality the Load responded according to the instruction. 3) Provides edits pertaining to the self-serve capacity associated with an ERS Generator. This change is necessary to define the acceptable parameters for self-serve capacity. 4) Adds Protocol language that will set the ERSTESTPF to significantly lower values and in some instances to zero for ERS Resources with three consecutive test failures in a 365 day period. In those instances where the ERSTESTPF are set to zero there will be no ERS payment for these Resources for the Standard Contract Term for which the third test failure occurred. 5) Provides additional administrative changes and clarifications to existing Protocol language pertaining to ERS.
Timeline
- Aug 25 '17
-
Sep 14 '17
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → WMS“To table NPRR846 and refer the issue to WMS.” — Passed→ Language Consideration
- Sep 27 '17
-
Oct 12 '17
PRS PRS MeetingPRSRecommended for Approval Recommended for approval“To recommend approval of NPRR846 as revised by PRS.” — Passed→ Impact Analysis Consideration
-
Nov 9 '17
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC Amended by the Nov 2 '17 ERCOT comments“To endorse and forward to TAC the 10/12/17 PRS Report as amended by the 11/2/17 ERCOT comments and the Impact Analysis for NPRR846.” — Passed→ Revision Request Consideration
-
Nov 30 '17
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR846 as recommended by PRS in the 11/9/17 PRS Report.” — Passed→ Revision Request Consideration
-
Dec 12 '17
BOARD Board of Directors MeetingBOARDApproved Approved“Approved NPRR846 as recommended by TAC in the 11/30/17 TAC Report.” — Passed
-
—
Posted since the last meeting