NPRR #829 · Revision Request
NPRR829 Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL
ReasonCurrently it is difficult for non-modeled generation to hedge in the Day-Ahead Market (DAM) due to potential superfluous collateral calls during high priced Real-Time Market (RTM) events. Using telemetered data from non-modeled generation will allow ERCOT to more accurately calculate QSE collateral requirements. This NPPR will increase DAM liquidity due to increased participation of non-modeled generation in the DAM. Implementing this NPRR has the potential to allow ERCOT to gain near Real-Time transparency into non-modeled generation which could increase their ability in analyzing Real-Time system conditions. Furthermore, ERCOT will better understand the true position of the QSE by Operating Day and will also better understand their cash flow.
Created2017-05-11
Approved2017-10-17
Sections Affected
1.3.1.16.3.26.5.5.216.11.4.3.2
Summary
This Nodal Protocol Revision Request (NPRR) provides a mechanism for a Qualified Scheduling Entity (QSE) with non-modeled generation to inform ERCOT in a timely manner the net generation to the ERCOT grid from their Non-Modeled Generators so that the output can be considered in the estimate of RTL. Absent this NPRR, output from Non-Modeled Generators is not included in estimating the QSE’s RTL, and the QSE is required to post a superfluous amount of collateral.
Timeline
-
Apr 26 '17
PRSFiled by Enchanted Rock / Electranet QSE I, LLC
-
May 11 '17
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → CREDIT WG Referred → WMS“To table NPRR829 and refer the issue to the Credit Work Group (Credit WG) and WMS.” — Passed→ Language Consideration
- May 17 '17
-
Jun 7 '17
Listed without action at 1 meeting
-
Jun 15 '17
PRS PRS MeetingPRSDeferred/Tabled Tabled“To table NPRR829 for one month.” — Passed→ Language Consideration
-
Jul 20 '17
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the Jul 14 '17 ERCOT comments“To recommend approval of NPRR829 as amended by the 7/14/17 ERCOT comments and as revised by PRS.” — Passed→ Impact Analysis Consideration
-
Aug 11 '17
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC Amended by the Aug 9 '17 ERCOT comments priority 2019 · rank 2510“To endorse and forward to TAC the 7/20/17 PRS Report as amended by the 8/9/17 ERCOT comments and Impact Analysis for NPRR829 with a recommended priority of 2019 and rank of 2510.” — Passed→ Revision Request Consideration
-
Aug 24 '17
TAC TAC MeetingTACDeferred/Tabled Tabled“To table NPRR829.” — Passed→ Revision Request Consideration
-
Sep 28 '17
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR829 as recommended by PRS in the 8/11/17 PRS Report and as revised by TAC; and endorsed the revised Impact Analysis for NPRR829.” — Passed→ Revision Request Consideration
-
Oct 17 '17
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“To approve NPRR829 as recommended by TAC in the 9/28/17 TAC Report.” — Passed
-
—
Posted since the last meeting