NPRR #801 · Revision Request
NPRR801 Non-Controllable Load Resource MW in PRC
ReasonAddresses current operational issues; Market efficiencies or enhancements
Created2016-09-15
Approved2016-12-13
Sections Affected
6.5.7.56.7.5
Summary
This Nodal Protocol Revision Request (NPRR) revises the Physical Responsive Capability (PRC) calculation from including the Responsive Reserve (RRS) service MW responsibility from Load Resources controlled by high-set under frequency relays to including all MW from these Load Resources from their current output to their Low Power Consumption (LPC) capped at 150% of the Qualified Scheduling Entity’s (QSE’s) RRS responsibility from non-Controllable Load Resources. The Operating Reserve Demand Curve (ORDC) reserves are adjusted in the Other Binding Document (OBD) to align with the PRC change. The Ancillary Service imbalance Settlement is changed to align with the change to the ORDC reserves.
Timeline
- Aug 31 '16
-
Sep 15 '16
PRS PRS MeetingPRSRecommended for Approval Recommended for approval“To recommend approval of NPRR801 as submitted.” — Passed→ Impact Analysis Consideration
-
Sep 21 '16
Listed without action at 1 meeting
-
Oct 13 '16
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC priority 2017 · rank 1870“To endorse and forward to TAC the 9/15/16 PRS Report as revised by PRS and the Impact Analysis for NPRR801 with a recommended priority of 2017 and a rank of 1870.” — Passed→ Revision Request Consideration
-
Oct 27 '16
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR801 as recommended by PRS in the 10/13/16 PRS Report.” — Passed→ Revision Request Consideration
-
Dec 13 '16
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“To approve NPRR801 as recommended by TAC in the 10/27/16 TAC Report.” — Passed