NPRR #735 · Revision Request

NPRR735  Load Resource Controlled by High-Set Under-Frequency Relay Resource Parameters

Approved sponsor ERCOT posted 2015-09-30 ercot.com
ReasonMarket efficiencies / enhancements
Created2015-10-15
Approved2015-12-08
Sections Affected
3.9 and 3.9.1
Summary
This Nodal Protocol Revision Request (NPRR) clarifies that the Current Operating Plan (COP) High Sustained Limit (HSL) for Load Resources controlled by high-set under-frequency relay should be equal to their expected power consumption. In Real-Time telemetry the HSL should equal their consumption. ERCOT can calculate the value for the additional available capacity from Load Resources controlled by high-set under frequency relays with a Responsive Reserve (RRS) Ancillary Service Resource Responsibility from (COP HSL – COP LSL – COP RRS). This value can be used in place of the COP value for additional available capacity from NPRR698, Clarifications to NPRR595, RRS Load Resource Treatment In ORDC.