NPRR #707 · Revision Request
NPRR707 Provision of Transmission System Voltage Telemetry to QSEs
ReasonRegulatory requirements
Created2015-06-11
Sections Affected
3.10.7.5.2
Summary
This Nodal Protocol Revision Request (NPRR) requires ERCOT to provide, upon request, transmission system voltage at each Generation Resource Point of Interconnection (POI) to the transmission system through telemetry via Inter-Control Center Communications Protocol (ICCP). This is necessary for the Generation Resource to comply with the latest version of North American Electric Reliability Corportation (NERC) Standard VAR-002-3, Generator Operation for Maintaining Network Voltage Schedules. Paragraph R2, 2.3, requires generation operators to monitor the voltage at the location specified in their voltage schedule. This data is readily available from ERCOT and provision of this data should not violate any of the provisions of Nodal Protocol Section 1.3, Confidentiality.
Timeline
- May 22 '15
-
Jun 11 '15
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → ROS“To table NPRR707 and refer related issues to ROS.” — Passed→ Language Consideration
- Jul 9 '15
-
Jul 16 '15
Listed without action at 3 meetings (Jul 16 '15 – Aug 13 '15)
- Sep 10 '15
-
Oct 5 '15
Listed without action at 1 meeting