ERCOT·WATCH Search ercot.com  ⌕
NPRR #641 · Revision Request

NPRR641  Season Definition Change for SwitchableResources Reporting Unavailable Capacity

Approved sponsor ERCOT posted 2014-07-10 ercot.com
ReasonProvides consistent treatment of summer and winter periods in reporting. Aligns Protocol language with existing defined terms.
Created2014-08-14
Approved2015-12-08
Sections Affected
16.5.4
Summary
This Nodal Protocol Revision Request (NPRR) replaces the phrase "Peak Period," used in Section 16.5.4 for Resource Entity reporting on Switchable Generation Resource availability, with the existing defined term, Peak Load Season.
Timeline