NPRR #623 · Revision Request
NPRR623 Measurement and Evaluation of ERS
ReasonAddresses current operational issues. Administrative Regulatory requirements Other: Clarifies ability of ERCOT to use available data to measure output /contribution of Resources in a configuration not fully anticipated in the Protocols.
Created2014-06-11
Sections Affected
3.14.3.38.1.3.1.28.1.3.1.4
Summary
This Nodal Protocol Revision Request (NPRR) proposes minor technical modification to the Protocols to explicitly account for the possibility that an ERS Load, and the ERS Generation located behind the same Point of Interconnection (POI) to the ERCOT Transmission Grid, can both jointly, or independently, provide ERS services and be evaluated appropriately, regardless of the operating characteristics of the industrial facility and its ERS baseline assignment.
Timeline
- May 8 '14
- May 15 '14
-
Jun 11 '14
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → WMS“To table NPRR623 and to refer the issue to WMS.” — Passed→ PRS for consideration.
- Jul 17 '14