NPRR613 Clarification of Fuel Adder into the Mitigated Offer Cap
ReasonRemoves potentially vague Protocol language with a clear and concise description of the application of the fuel adder into the Mitigated Offer Cap.
Created2014-04-10
Approved2014-06-10
Sections Affected
4.4.9.4.1
Summary
This Nodal Protocol Revision Request (NPRR) clarifies the implementation of the fuel adder into the Mitigated Offer Cap as provided in NPRR485, Clarification for Fuel Adder Provisions, approved by ERCOT Board of Directors 11/13/2012, and as planned to take effect upon ERCOT’s implementation of the automated solution of NPRR485. Additional Background: NPRR485 introduced the concept of a verifiable fuel adder to be used in the calculation of the Mitigated Offer Cap and Verifiable Startup and minimum energy costs. When NPRR485 was approved on November 13, 2012, the specific calculation of how the fuel adder would be used in the Mitigated Offer Cap was not yet determined. Per Appendix 6 and 7 of the Verifiable Cost Manual, as an interim step and manual work around, Quick Start Generation Resources (QSGRs) had the fuel adder incorporated into their verifiable Incremental Heat Rate (IHR) points. All other Generation Resources were not eligible to get the fuel adder until ERCOT determined the automated solution needed to incorporate the fuel adder into the Mitigated Offer Cap and implemented that solution into its systems.
Timeline
- Mar 26 '14
-
Apr 10 '14
PRS PRS MeetingPRSRecommended for Approval Recommended for approval“To recommend approval of NPRR613 as submitted.” — Passed→ PRS for Impact Analysis review
- Apr 16 '14
-
May 15 '14
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC“To endorse and forward the 4/10/14 PRS report and Impact Analysis for NPRR613 to TAC.” — Passed→ TAC for consideration.
-
May 29 '14
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR613 as recommended by PRS in the 5/15/14 PRS Report.” — Passed→ ERCOT Board for consideration
-
Jun 10 '14
BOARD Board of Directors MeetingBOARDApproved Approved“To approve NPRR613 as recommended by TAC in the 5/29/14 TAC Report.” — Passed
-
—