ERCOT·WATCH Search ercot.com  ⌕
NPRR #561 · Revision Request

NPRR561  Clarification of Shutdown Telemetry Status

Approved sponsor ERCOT posted 2013-08-09 ercot.com
ReasonThe language in Protocol Section 3.9.1 is inconsistent with the Business Practice Manual "ERCOT and QSE Operations Practices During the Operating Hour", Section 3.3, Generation Resource Shutdown.
Created2013-09-19
Approved2013-12-10
Sections Affected
3.9.1
Summary
This Nodal Protocol Revision Request (NPRR) revises Section 3.9.1 to clarify that Generation Resources that are providing Non-Spinning Reserve (Non-Spin) and that can continue to be available for deployment within the time frame established in the Protocols, may continue to carry Off-Line Non-Spin during shutdown.
Timeline