NPRR #532 · Revision Request
NPRR532 Performance Measurement and Verification and Telemetry Requirements for Load Resources Providing Non-Spin
ReasonCurrent market rules relating to Load Resource performance evaluation in Ancillary Services are limited to a methodology best described as "meter-before/meter-after" (as defined in North American Energy Standards Board (NAESB) Demand Response Measurement & Verification standards, adopted by the Federal Energy Regulatory Commission (FERC)). Under this existing methodology, a Load reduction in a deployment event is measured from the Load Resource’s static Load level at the time of Dispatch; the Load Resource must maintain such reduction throughout the event. This works well for industrial consumers with high Load factors, but can lead to either over-provision or under-provision of Demand response by other types of consumers, especially weather-sensitive Loads. NAESB and FERC standards also provide for the baseline methodology, which measures and verifies performance by comparing actual Load to a reliable estimate of what the Load would have been in the absence of the deployment.
Created2013-04-18
Approved2013-09-17
Sections Affected
3.9.14.4.7.2.16.5.5.26.5.7.6.2.38.1.1.2.1.38.1.1.3.38.1.1.4.3
Summary
This Nodal Protocol Revision Request (NPRR) enables participation in the Non-Spinning Reserve (Non-Spin) Service market for Load Resources whose provision of Demand response is most accurately measured and verified using a baseline performance evaluation methodology. The NPRR establishes a method for evaluating Non-Spin performance using a baseline methodology, which compares actual Load to a reliable estimate of what the Load would have been in the absence of the deployment. This NPRR also establishes new telemetry requirements for Qualified Scheduling Entities (QSEs) representing Load Resources in the Non-Spin market to allow ERCOT’s systems to monitor the status and performance of those Load Resources in Real-Time.
Timeline
- Mar 26 '13
-
Apr 18 '13
PRS Protocol Revision Subcommittee (PRS) MeetingPRSDeferred/Tabled Tabled Referred → WMS Referred → ROS“To table NPRR532 and refer the issue to WMS and ROS.” — Passed→ PRS language consideration
- May 8 '13
- May 16 '13
-
Jun 4 '13
Listed without action at 2 meetings (Jun 4 '13 – Jun 12 '13)
- Jun 13 '13
-
Jun 20 '13
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval Recommended for approval Amended by the Jun 18 '13 Citigroup Energy comments“To recommend approval of NPRR532 as amended by the 6/18/13 Citigroup Energy comments.” — Passed→ PRS Impact Analysis review
- Jul 10 '13
-
Jul 11 '13
Listed without action at 1 meeting
-
Jul 18 '13
PRS Protocol Revision Subcommittee (PRS) MeetingPRSDeferred/Tabled Tabled“To table NPRR532 for one month.” — Passed→ PRS Impact Analysis review
-
Aug 22 '13
PRS Protocol Revision Subcommittee (PRS) MeetingPRS Urgent status“to grant NPRR532 Urgent status” — Passed→ PRS consideration of NPRR532
- Aug 28 '13
-
Sep 5 '13
TAC Technical Advisory Committee (TAC) MeetingTACRecommended for Approval Recommended for approval Amended by the Aug 29 '13 ERCOT comments“To recommend approval of NPRR532 as recommended by PRS in the 8/22/13 PRS Report and as amended by the 8/29/13 ERCOT comments.” — Passed→ ERCOT Board consideration of NPRR532
-
Sep 17 '13
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“To approve NPRR532 as recommended by TAC in the 9/5/13 TAC Report.” — Passed
-
—
Posted since the last meeting