NPRR #489 · Revision Request
NPRR489 Planning Reserve Margin
ReasonThe calculation methodology used by ERCOT to determine the PRM for the semi-annual Capacity, Demand and Reserves Report has historically been developed by the Generation Adequacy Task Force (GATF), subsequently approved by the Wholesale Market Subcommittee (WMS), and then ultimately approved by the Technical Advisory Committee (TAC). In 2010, Market Participants decided that adding the PRM methodology into the Planning Guide would increase the transparency of the PRM methodology, and also provide a formal change and approval procedure via the Planning Guide Revision Request (PGRR) process. Including the PRM methodology in the Planning Guide also provided for ERCOT Board approval. The PGRR approval requires a recommendation from the Planning Working Group (PLWG), the Reliability and Operations Subcommittee (ROS), TAC, and finally ERCOT Board approval. While this approval path achieved its objective (i.e., to improve and formalize the PRM approval process) it did not include language acknowledging that the PRM methodology had historically been under GATF and WMS purview. Discussions at WMS and ROS resulted in both subcommittees agreeing the PRM calculation methodology: (1) Is important enough that it needs to be transparent; (2) Needs input from WMS, ROS, and any other interested stakeholder body or Market Participant, and (3) Should receive ERCOT Board approval. It was also determined the best way to meet these three goals is to move the PRM methodology from the Planning Guide to the Protocols.
Created2012-10-18
Approved2013-03-19
Sections Affected
2.12.23.2.6 (new)3.2.6.1 (new)3.2.6.2 (new)3.2.6.2.1 (new)3.2.6.2.2 (new)21.1
Summary
This Nodal Protocol Revision Request (NPRR) adds the Planning Reserve Margin (PRM) methodology, currently in the Planning Guide, to the Protocols.
Timeline
- Oct 3 '12
-
Oct 18 '12
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval Recommended for approval Amended by the Oct 17 '12 ERCOT comments“To recommend approval of NPRR489 as amended by the 10/17/12 ERCOT comments and as revised by PRS” — Passed→ PRS IA Review
-
Oct 19 '12
Listed without action at 1 meeting
- Nov 7 '12
-
Nov 15 '12
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC“To endorse and forward the 10/18/12 PRS Report and Impact Analysis for NPRR489 to TAC” — Passed→ TAC Consideration
-
Nov 29 '12
TAC Technical Advisory Committee (TAC) MeetingTACDeferred/Tabled Tabled“To table NPRR489” — Passed→ TAC Consideration
- Dec 5 '12
-
Jan 3 '13
TAC Technical Advisory Committee (TAC) MeetingTACRecommended for Approval Recommended for approval Amended by the Dec 7 '12 NRG Energy, Inc. comments“To recommend approval of NPRR489 as amended by the 12/7/12 NRG Energy, Inc. comments” — Passed→ ERCOT Board Consideration
- Mar 7 '13
-
Mar 19 '13
BOARD Board of Directors MeetingBOARDApproved Recommended for approval Amended by the Feb 18 '13 ERCOT comments“To approve NPRR489 as revised by the 2/18/13 ERCOT Comments” — Passed
-
—
Posted since the last meeting