NPRR #480 · Revision Request
NPRR480 Removal of Language for Relaxing Transmission Constraints
ReasonThe language in paragraph (3) of Section 6.5.9.1 is inconsistent with Attachment 1-EOP-002-2.1, Energy Emergency Alerts, of NERC Standard EOP-002-3, Capacity and Energy Emergencies, which outlines the appropriate actions ERCOT should take in each level of an Energy Emergency Alert (EEA). The NERC Reliability Standards do not allow ERCOT to relax Operating Limits during an Emergency Condition.
Created2012-09-20
Approved2012-12-11
Sections Affected
6.5.9.1
Summary
This Nodal Protocol Revision Request (NPRR) deletes Protocol language that is inconsistent with North American Electric Reliability (NERC) Reliability Standards.
Timeline
- Aug 28 '12
-
Sep 20 '12
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval Recommended for approval“To recommend approval of NPRR480 as submitted” — Passed→ PRS IA Review
-
Oct 18 '12
PRS Protocol Revision Subcommittee (PRS) MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC“To endorse and forward the 9/20/12 PRS Report and Impact Analysis for NPRR 480 to TAC” — Passed→ TAC Consideration
-
Nov 1 '12
TAC Technical Advisory Committee (TAC) MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR480 as recommended by PRS in the 10/18/12 PRS Report” — Passed→ ERCOT Board Consideration
-
Dec 11 '12
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“To approve NPRR480 as recommended by TAC in the 11/1/12 TAC Report” — Passed
-
—
Posted since the last meeting