NPRR #406 · Revision Request
NPRR406 Clarification of the Timeline for Calculating the Value of X at Minimum Energy Level
ReasonNPRR305, Timeline for Calculating the Value of X, revised paragraph (a) of Section 5.6.1.1 to clarify that the effective date for the value of X is described in the Verifiable Cost Manual. However, similar changes to paragraph (2) of Section 5.6.1.2 were unintentionally omitted. This NPRR ensures consistency between these two provisions.
Created2011-09-22
Approved2011-12-12
Sections Affected
5.6.1.2
Summary
This Nodal Protocol Revision Request (NPRR) clarifies that the effective date for the value of X as applied to fuel at the minimum energy level is described in the Verifiable Cost Manual. This clarification is consistent with paragraph (a) of Section 5.6.1.1, Verifiable Startup Costs, which also contains language that references the Verifiable Cost Manual for the effective date of the value of X.
Timeline
- Sep 2 '11
-
Sep 22 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval“To recommend approval of NPRR406 as submitted.” — Passed→ PRS Impact Analysis review
-
Oct 20 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC“To endorse and forward the 9/22/11 PRS Report and Impact Analysis for NPRR406 to TAC.” — Passed→ TAC consideration of NPRR406
-
Nov 3 '11
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR406 as recommended by PRS in the 10/20/11 PRS Report.” — Passed→ ERCOT Board consideration of NPRR406
-
Dec 12 '11
BOARD Board of Directors MeetingBOARDApproved Approved“To approve NPRR406 as recommended by TAC in the 11/3/11 TAC Report.” — Passed