ERCOT·WATCH Search ercot.com  ⌕
NPRR #390 · Revision Request

NPRR390  Clarification of the Applicability of the Use of the Refund Option

Approved Urgent sponsor ERCOT posted 2011-07-06 ercot.com
ReasonThe PCRR refund option is meant to settle at the lesser of the scheduled output of a Generation Resource or the MW value of the PCRR. As the output schedules of Generation Resources that are not in ERCOT are not available to ERCOT, the PCRR refund option is not applicable when the source is on the non-ERCOT side of a DC Tie.
Created2011-07-21
Approved2011-08-16
Sections Affected
7.4.2
Summary
This Nodal Protocol Revision Request (NPRR) clarifies the ability to request refund option Pre-Assigned Congestion Revenue Rights (PCRRs) across high voltage Direct Current Ties (DC Ties).
Timeline