NPRR #377 · Revision Request

NPRR377  Alternate Inputs to Base Point Deviation Charge

Approved sponsor ERCOT posted 2011-06-07 ercot.com
ReasonThe reason for this NPRR is to eliminate the shortened SCED interval exemption due to AABP deficiency and more closely align the performance metric and base point deviation penalties.
Created2011-06-23
Approved2011-12-12
Sections Affected
6.6.56.6.5.1.16.6.5.1.26.6.5.26.6.5.3
Summary
This Nodal Protocol Revision Request (NPRR) will align the Adjusted Aggregated Base Points (AABP) formula with the inputs to the Generation Resource Energy Deployment Performance (GREDP) measure. The current formula for AABP inaccurately assesses Base Point Deviation charges for under and over generation when shortened Security-Constrained Economic Dispatch (SCED) intervals occur. Additionally, this NPRR includes bill determinants to track the over and under generated volumes and correct language for bill determinants P1 and P2.
Timeline