NPRR #362 · Revision Request

NPRR362  Changes to PRC Calculation

Approved sponsor ERCOT posted 2011-05-04 ercot.com
ReasonProtocol language could be interpreted to require a higher Physical Responsive Capability (PRC) than that determined by current systems.
Created2011-05-19
Approved2011-08-16
Sections Affected
6.5.7.56.5.9.4.2
Summary
This Nodal Protocol Revision Request (NPRR) aligns the Protocols with the current systems. The proposed changes properly reflect the current Responsive Reserve (RRS) which is supplied from Load Resources into the PRC calculation. This NPRR also deletes the method for calculating the PRC from Energy Emergency Alert (EEA) Levels 1 and 2.