NPRR #362 · Revision Request
NPRR362 Changes to PRC Calculation
ReasonProtocol language could be interpreted to require a higher Physical Responsive Capability (PRC) than that determined by current systems.
Created2011-05-19
Approved2011-08-16
Sections Affected
6.5.7.56.5.9.4.2
Summary
This Nodal Protocol Revision Request (NPRR) aligns the Protocols with the current systems. The proposed changes properly reflect the current Responsive Reserve (RRS) which is supplied from Load Resources into the PRC calculation. This NPRR also deletes the method for calculating the PRC from Energy Emergency Alert (EEA) Levels 1 and 2.
Timeline
- May 4 '11
-
May 19 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval“To recommend approval of NPRR362 as revised by PRS” — Passed→ PRS IA Review
- Jun 15 '11
-
Jun 23 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC“To endorse and forward the 5/19/11 PRS Report and Impact Analysis for NPRR362 to TAC” — Passed→ TAC Consideration
-
Jul 7 '11
TAC TAC MeetingTACRecommended for Approval Recommended for approval Amended by the Jun 29 '11 ERCOT comments“To recommend approval of NPRR362 as amended by the 6/29/11 ERCOT comments” — Passed→ ERCOT Board Consideration
-
Jul 20 '11
Listed without action at 1 meeting
- Aug 11 '11
-
Aug 16 '11
BOARD Board of Directors MeetingBOARDApproved Approved“To approve NPRR362 as recommended by TAC in the 7/7/11 TAC Report” — Passed
- Sep 1 '11