NPRR #340 · Revision Request
NPRR340 Introduction and Definition of Duration-Limited Resources (formerly "Unannounced HSL test for Duration-Limited Resources")
ReasonCurrent testing requirements are designed for conventional Generation Resources, which provide unlimited energy and are able to participate in all markets. This NPRR defines Duration-Limited Resource and adjusts the test for this type of Resource.
Created2011-03-24
Sections Affected
2.13.17.23.17.38.1.1.2
Summary
This Nodal Protocol Revision Request (NPRR) defines Duration-Limited Resource and amends the General Capacity Testing Requirements to reflect operational characteristics of this type of Resource.
Timeline
-
Mar 21 '11
PRSFiled by Praveen Kathpalon on behalf of AES
- Mar 24 '11
- Apr 6 '11
- Apr 8 '11
- Apr 11 '11
- Apr 21 '11
- May 11 '11
- May 12 '11
-
May 19 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the May 18 '11 ERCOT comments Forwarded → TAC“To recommend approval of NPRR340 as amended by the 5/18/11 ERCOT comments and to forward NPRR340 to TAC.” — Passed→ TAC for consideration.
-
Jun 2 '11
TAC TAC MeetingTACDeferred/Tabled Tabled Referred → WMS“To table NPRR340 for one month and to request WMS to reevaluate the inclusion of energy in the definition of DLR and to attempt to eliminate inconsistencies relative to testing between paragraphs (5) and (6) of Section 8.1.1.2.1.1.” — Passed→ TAC for consideration.
- Jun 15 '11
- Jul 7 '11
- Aug 4 '11
-
Aug 8 '11
Listed without action at 4 meetings (Aug 8 '11 – Nov 3 '11)
-
Oct 23 '14
TAC TAC MeetingTACApproved Withdrawal“To approve the Request for Withdrawal for NPRR340.” — Passed
-
—
Posted since the last meeting