NPRR #324 · Revision Request
NPRR324 Conductor/Transformer Transmission Facility Rating
ReasonThe requirement for Conductor/Transformer Rating is required for compliance with North American Electric Reliability Corporation (NERC) Reliability Standard FAC-010, System Operating Limits Methodology for the Planning Horizon.
Created2011-03-24
Approved2011-07-19
Sections Affected
2.12.23.10.7.1.1
Summary
This Nodal Protocol Revision Request (NPRR) adds the Conductor/Transformer Rating, normally used for Rate C in the Annual Planning Model, as a fourth Transmission Facility Rating and adds the description from the Operating Guides to the Rating terms definitions in the Nodal Protocols.
Timeline
- Feb 10 '11
-
Mar 24 '11
PRS PRS MeetingPRSDeferred/Tabled Referred → ROS“To refer NPRR324 to ROS” — Passed→ ROS consideration
- Apr 11 '11
-
Apr 21 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the Apr 12 '11 ROS comments“To recommend approval of NPRR324 as amended by the 4/12/11ROS comments.” — Passed→ PRS consideration
-
May 19 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC“To endorse and forward the 4/21/11 PRS Report and Impact Analysis for NPRR324 to TAC.” — Passed→ TAC consideration
-
Jun 2 '11
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR324 as recommended by PRS in the 5/19/11 PRS Report.” — Passed→ Board consideration
-
Jul 19 '11
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“To approve NPRR324 as recommended by TAC in the 6/2/11 TAC Report.” — Passed