NPRR314 Requirement to Post Generation Resources Temporal Constraints
ReasonThe posting of this information increases reliability by allowing Qualified Scheduling Entities (QSEs) with Resources the ability to verify the temporal constraints ERCOT is using in the RUC process so that commitment decisions will be made with accurate availability information. If ERCOT’s Security Sequence is utilizing changes to the telemetered Resource Status to detect the temporal condition of a Resource, there may be inadvertent changes to the Resource Status in the QSE’s control system that do not reflect the actual condition of the Generation Resource. Posting of the Resource’s current Off-Line hours and corresponding startup times will allow QSEs to verify the assumed condition used by RUC in the Security Sequence.
Created2011-03-24
Approved2011-07-19
Sections Affected
5.1
Summary
This Nodal Protocol Revision Request (NPRR) adds language to specify the need for ERCOT to post to the Market Information System (MIS) Certified Area the current time since a Generation Resource last went Off-Line (in hours) and the corresponding startup time ERCOT is using for of all Off-Line Generation Resources which may be considered in any Reliability Unit Commitment (RUC) process.
Timeline
-
Feb 1 '11
PRSFiled by Luminant Energy Company, LLC
-
Mar 24 '11
PRS PRS MeetingPRSDeferred/Tabled Tabled Referred → WMS“To table and request that WMS review NPRR314.” — Passed→ PRS language consideration
- Apr 4 '11
- Apr 8 '11
-
Apr 21 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the Apr 5 '11 Luminant comments“To recommend approval of NPRR314 as amended by the 4/5/11 Luminant comments.” — Passed→ PRS Impact Analysis review
-
May 19 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC Priority“To endorse and forward the 4/21/11 PRS Report, Impact Analysis and Cost Benefit Analysis for NPRR314 to TAC and to recommend a priority of High and rank of 15.4.” — Passed→ TAC consideration of NPRR314
-
Jun 2 '11
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR314 as recommended by PRS in the 5/19/11 PRS Report.” — Passed→ ERCOT Board consideration of NPRR314
-
Jul 19 '11