NPRR #290 · Revision Request
NPRR290 ERCOT Publication of DAM PSS/E Files
ReasonThe original intent of the Market Participants was to have incremental updates published by ERCOT on a daily basis so that they could properly model the ERCOT System and replicate the DAM solution. ERCOT has stated in the Nodal Advisory Task Force (NATF) meetings and through the "Networking Modeling Expectations for TSP, REs, and QSEs" whitepaper that it will not be able to comply with the Protocol requirement to provide daily model updates. Therefore, to provide Market Participants the transparency and ability to review the implied power flows of the DAM solution, this NPRR adds a requirement for ERCOT to post daily on the Market Information System (MIS) Public Area a package of transmission data files in PSS/E format that describe each hour’s associated transmission system topology (including contingencies) and mapping of generators, Loads, transmission lines, transformers, and Hubs.
Created2010-11-18
Approved2011-04-19
Sections Affected
4.2.3
Summary
This Nodal Protocol Revision Request (NPRR) enhances transparency of the transmission topology (including all scheduled Outages) used in the Day-Ahead Market (DAM) by requiring ERCOT to publish certain data files (in Power System Simulator for Engineering (PSS/E format) for easy review by all Market Participants with standard power flow tools such as PTI PSS/E, Power World Simulator, etc. Much of the tools needed by ERCOT to meet the requirements of this NPRR were developed and semi-automated during the Nodal DAM market trials and this NPRR seeks to leverage that work for long term market benefit.
Timeline
-
Oct 27 '10
PRSFiled by Henry Durrwachter on behalf of Luminant Energy Company LLC
- Nov 16 '10
-
Nov 18 '10
PRS PRS MeetingPRSDeferred/Tabled Tabled Action“To table NPRR290 for one month; to request that ERCOT implement the manual workaround based on the model load schedule as done in market trials and as resources allow; and to provide estimated costs for the various options of implementation.” — Passed→ PRS for consideration.
-
Dec 16 '10
PRS PRS MeetingPRSDeferred/Tabled Tabled“To table NPRR290 for one month.” — Passed→ PRS for consideration.
-
Jan 20 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the Luminant Energy comments“To recommend approval of NPRR290 as amended by the Luminant Energy comments and as revised by PRS.” — Passed→ PRS for Impact Analysis review.
- Jan 26 '11
-
Feb 17 '11
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Forwarded → TAC Amended by the Feb 16 '11 ERCOT comments rank 13“To endorse and forward the 1/20/11 PRS Report as amended by the 2/16/11 ERCOT comments, Impact Analysis and Cost Benefit Analysis for NPRR290 to TAC with a recommended priority of High and a rank of 13.” — Passed→ TAC for consideration.
-
Mar 3 '11
TAC TAC MeetingTACRecommended for Approval Recommended for approval“To recommend approval of NPRR290 as recommended by PRS in the 2/17/11 PRS Report as revised by TAC.” — Passed→ ERCOT Board for consideration.
-
Apr 19 '11
BOARD Board of Directors MeetingBOARDApproved Recommended for approval“To approve NPRR290 as recommended by TAC in the 3/3/11 TAC Report.” — Passed
-
—