NPRR #266 · Revision Request

NPRR266  Installed Capacity of Unregistered Distributed Generation (DG)

Approved sponsor CPS Energy posted 2010-08-31 ercot.com
ReasonThe approved NPRR208, Registration and Settlement of Distributed Generation (DG) Less Than One MW, added language to Section 16.5, paragraph (2) requires that ERCOT report the total unregistered installed capacity below the current DG registration threshold, summed by Load Zone. The report is to be used to determine if the registration threshold needs to be reduced to keep the total installed capacity of unregistered DG to no more than seven MW in any Load Zone. However, the language can be misinterpreted to mean that the capacity of registered and unregistered DG is to be totaled.
Created2010-09-23
Approved2010-11-16
Sections Affected
16.5
Summary
This Nodal Protocol Revision Request (NPRR) clarifies that only the capacity of unregistered Distributed Generation Resources (DGs) is totaled for the determination that the DG registration threshold must be lowered.
Timeline