NPRR248 Removal of Loads from NOIE Load Zone (formerly "Removal of Loads from Pre-1999 NOIE Load Zone")
ReasonThis NPRR provides for a NOIE in NOIE Load Zone to be assigned to the appropriate Competitive Load Zone upon termination of its pre-1999 power supply arrangement.
Created2010-07-22
Approved2010-09-21
Sections Affected
3.4.23.4.37.4.2
Summary
This Nodal Protocol Revision Request (NPRR) provides that a member assigned to a Non-Opt-In Entity (NOIE) Load Zone due to being in a group of NOIEs that are parties to the same pre-1999 power supply arrangement and having a 2003 peak Load in excess of 2,300 will be assigned to an appropriate Competitive Load Zone if it terminates its pre-1999 power supply arrangement.
Timeline
-
Jun 23 '10
PRSFiled by Kerrville Electric Cooperative and San Bernard Electric Cooperative
- Jul 22 '10
-
Aug 19 '10
PRS PRS MeetingPRSRecommended for Approval Recommended for approval Amended by the Aug 12 '10 LCRA-Kerrville-San Bernard comments Forwarded → TAC“To recommend approval of NPRR248 as amended by the 8/12/10 LCRA-Kerrville-San Bernard comments and to forward NPRR248 to TAC via roll call vote.” — Passed→ TAC consideration of NPRR248
-
Sep 2 '10
TAC TAC MeetingTACRecommended for Approval Recommended for approval Amended by the Aug 31 '10 ERCOT comments“To recommend approval of NPRR248 as amended by the 8/31/10 ERCOT comments.” — Passed→ ERCOT Board consideration of NPRR248
-
Sep 21 '10
BOARDEmail Vote / Unlisted MeetingBOARDApproved Recommended for approval“To approve NPRR248 as recommended by TAC in the 9/2/10 TAC Report.” — Passed
-
—