NPRR #248 · Revision Request

NPRR248  Removal of Loads from NOIE Load Zone (formerly "Removal of Loads from Pre-1999 NOIE Load Zone")

Approved sponsor Kerrville Electric Cooperative and San Bernard Electric Cooperative posted 2010-06-23 ercot.com
ReasonThis NPRR provides for a NOIE in NOIE Load Zone to be assigned to the appropriate Competitive Load Zone upon termination of its pre-1999 power supply arrangement.
Created2010-07-22
Approved2010-09-21
Sections Affected
3.4.23.4.37.4.2
Summary
This Nodal Protocol Revision Request (NPRR) provides that a member assigned to a Non-Opt-In Entity (NOIE) Load Zone due to being in a group of NOIEs that are parties to the same pre-1999 power supply arrangement and having a 2003 peak Load in excess of 2,300 will be assigned to an appropriate Competitive Load Zone if it terminates its pre-1999 power supply arrangement.