NPRR #219 · Revision Request

NPRR219  Resolution of Alignment Items A33, A92, A106, and A150 - TSPs Must Submit Outages for Resource Owned Equipment and Clarification of Changes in Status of Transmission Element Postings

Approved sponsor ERCOT posted 2010-03-23 ercot.com
ReasonThis change conforms the Nodal Protocols to the as-built Nodal system.
Created2010-04-22
Approved2015-02-10
Sections Affected
2.13.1.5.13.3.2.16.3.2
Summary
This Nodal Protocol Revision Request (NPRR) will require the Resource Entity to designate a Transmission Service Provider (TSP) as the responsible Entity that will manage Outage Scheduler entries for the Resource Entity for Transmission Elements owned by the Resource other than the outage of the Generation or Load Resource itself. This NPRR will also require all changes or expected changes in the status of Transmission Facilities to be in the Outage Scheduler to ensure that all Outages in the Outage Scheduler are provided to the Market Information System (MIS).